Project Title
Corrosion Control Document untuk Unit CDU II dan HVU II pada RU III Plaju
Description of Work
Development of Corrosion Control Document (CCD) and IOW for CDU and HVU Unit in RU III Plaju based on API 970 and API 584
Project Title
RBI, Corrosion Control Document (CCD), and Integrity Operating Window (IOW) Development
Description of Work
RBI Assessment, NDE mapping, CCD, and IOW for 7 Units in Paraxylene Area and 18 AST Groups consists of 234 ASTs using DNV Synergi Plant RBI Onshore v.5.4.1.34.
Project Title
Integrity Operating Windows Development, Area HCC, HSC, HOC, & UTL
Description of Work
Develop Integrity Operating Windows (IOW) Study for Area HCC, HSC, HOC, and UTL based on API 584
Project Title
Development of Asset Integrity & Reliability Management System (AIRMS) – Phase 1 & Phase 2
Description of Work
PGN LNG requested provisional study for an asset integrity and reliability management system (AIRMS) for Lampung ORF Asset. The main concept of AIRMS is to follow the integrity management system philosophy of Plan-Do-Action-Check process.

The work is sequenced into 2 stages. First, the development of AIRMS philosophy and data management & risk assessment software. Second, the implementation of risk-based inspection and RCM by using the software that previously developed. The scope covered the onshore receiving facility (ORF) including static pressurized equipment, piping, and rotating equipment, also the pipeline offshore system and tower yoke mooring structure.

The AIRMS concept and philosophy was developed based on the corporate management & policy that is benchmarked by regulatory requirement and well-known industrial best practices. Then the customized web-based application software is developed as an integrated tool to manage the asset data and to assess the risk level as a basis of the inspection and maintenance strategy optimization.
Project Title
Assessment RBI PT Pertamina (Persero) RU VII Kasim
Description of Work
RBI Visual inspection, RBI Assessment, NDE mapping, CCD, and IOW for 5 Areas using DNV Synergi Plant RBI Onshore v.5.6.0.26.
Project Title
RBI Assessement and Development of CCD for Areas FOC II, LOC I dan LOC III for Pertamina RU IV Cilacap
Description of Work
RBI Visual inspection, RBI Assessment, NDE mapping, CCD, and IOW for 13 Units in 3 Areas using DNV Synergi Plant RBI Onshore v.5.4.1.34.